DC Environmental
consulting and training services

505.869.8000

LinkedIn
navigation: Services » Construction » Asbestos Abatement Oversite

Asbestos Abatement Oversite

Owners need to be assured that their asbestos abatement contractor is following applicable rules and regulations throughout the course of the asbestos abatement project. Oftentimes, once the project is started, contractors erect barriers which inhibit entry by unauthorized personnel, including the owner. Without proper certification, entry into these areas is prohibited.

Owners need to have a knowledgeable representative on site, and within the containment area, to function as their eyes and ears during an asbestos abatement project. Without this, owners have no means of knowing if the regulations are being followed; safe work practices implemented, costs controlled, or the work being done as requested.

DC Environmental, Inc. functions as an independent, third-party representative of the owner for liability minimization, assurance of work practices, cost containment, and regulatory agency Interface.